Thomas F. Riley Terminal Construction Photos
April 2011

Aerial view of John Wayne Airport, April 2011

Aerial view of John Wayne Airport, April 2011

New North Commuter Terminal, April 2011

New North Commuter Terminal, April 2011

The new North Commuter Terminal, left, reflects the temporary North Commuter Holdroom building and the JWA airfield

The new North Commuter Terminal, left, reflects the temporary North Commuter Holdroom building and the JWA airfield

Inside the new North Commuter Terminal, April 2011

Inside the new North Commuter Terminal, April 2011

Bridge from Terminal B to new Terminal C, April 2011

Bridge from Terminal B to new Terminal C, April 2011

Terminal C departure level, as seen from the upper roadway, April 2011

Terminal C departure level, as seen from the upper roadway, April 2011

Inside Terminal C, April 2011

Inside Terminal C, April 2011

New Terminal C Baggage claim area, April 2011

New Terminal C Baggage claim area, April 2011

Looking out over the airfield, from inside the future South Commuter Terminal, April 2011

Looking out over the airfield, from inside the future South Commuter Terminal, April 2011

Inside Terminal C baggage claim, looking toward the lower roadway area, April 2011

Inside Terminal C baggage claim, looking toward the lower roadway area, April 2011

Escalator connecting Terminal C baggage area to departure level, April 2011

Escalator connecting Terminal C baggage area to departure level, April 2011

Future concessions area in new Terminal C, April 2011

Future concessions area in new Terminal C, April 2011

Future international gate area located inside Terminal B concourse, April 2011

Future international gate area located inside Terminal B concourse, April 2011

South Commuter Terminal, April 2011

South Commuter Terminal, April 2011

Inside the South Commuter Terminal, looking out over the airfield, April 2011

Inside the South Commuter Terminal, looking out over the airfield, April 2011

Inside the new South Commuter Terminal, April 2011

Inside the new South Commuter Terminal, April 2011