Parking Lot C
Background
Parking Structure B1 (located south of Terminal B) was demolished/deconstructed in late 2009 in order to make room for construction of the new Terminal C and Parking Structure C.
A temporary Parking Lot C is being utilized for passenger vehicle parking until the new Terminal and Parking Structure are completed. Parking Lot C, located south of the Terminal Complex is situated on a portion of what will be the new South Remain-Over-Night aircraft parking area. The Airport provides free shuttle service to Terminals A and B. A photo of Parking Lot C is presented below:

Contractors
| Program Manager: | Parsons (www.parsons.com) Selection: March 7, 2006 Contract Award: June 27, 2006 |
|---|---|
| Architect/Engineer: | P&D Constultants (www.tcb.aecom.com) |
| Construction Manager: | Butier Engineers, Inc (www.butier.com) |
| General Contractor: | Excel Paving |
The Airport Improvement Program includes construction of a new South Remain-Over-Night (RON) aircraft parking area, a new multi-level Terminal C with six new commercial passenger gates, new security checkpoints, new commuter facilities as well as new Parking Structure C and a Central Utility Plant.