John Wayne Airport anticipates issuing Requests for Proposals (RFPs) / Requests for Qualifications (RFQs) for the following projects. Please note that this may not be a complete list of upcoming projects, and all dates are estimates and subject to change at any time.

Project Name:

Thomas F. Riley Terminal Complex Improvements Project

Project No.:

P202

Project Description:

The Thomas F. Riley Terminal Complex Improvements Project brings various improvements to the Terminal Complex at JWA. Where applicable, all project improvements will be completed to the essential facility standard. These improvements include, but are not limited to architectural improvements; seismic upgrade of Terminal A & B including structural and non-structural items; electrical infrastructure; heating, ventilation and air-conditioning (HVAC) and mechanical systems; plumbing systems; lighting systems; American with Disabilities Act (ADA) compliance; Information Technology (IT) systems; security and closed circuit television (CCTV) systems; general aesthetics improvements; and fire sprinkler and alarm systems. These improvements will improve existing facilities aesthetics and infrastructure, allowing patrons of JWA and Orange County to experience a uniform level of quality throughout the Terminal Complex.

Status:

Prequalification Documents have been received on April 30, 2014 and are being reviewed.

Upcoming Milestones:

 

Project Manager:

Rick Cathey
(949) 252-5129
rcathey@ocair.com

Project Name:

Paularino Gate Improvements

Project No.:

P211

Project Description:

The Paularino Avenue Gate is JWA’s main vehicular airfield access gate and is located at the southeast terminus of Paularino Avenue. The intersection of Paularino and Airway Avenues is approximately 450’ northwest of the Paularino Avenue Gate. The intent of the project is to accomplish the following:

  • Paularino Street Reconstruction
  • JWA Administration Building Improvements
  • Guard Shelter and Security Fence Improvements

Status:

The Board of Supervisors selected AE Consulting, Inc. as primary and RBF Consulting, Inc. as alternate firms to provide architect-engineer services for this project.

Upcoming Milestones:

Board award is anticipated on September 9, 2014.

Project Manager:

John Pape
(949) 252-6058
jpape@ocair.com

Project Name:

Campus Drive/Bristol Street Right Turn Lane Project

Project No.:

P278

Project Description:

The project consists, in general, of widening southbound Campus Drive to provide an additional 600 foot long, third right turn lane onto northbound Bristol Street. The work includes removal of existing facilities and vegetation, demolition of an existing maintenance building, site clearing, grading, road pavement, curb return, retaining wall, traffic signal modification, temporary security fence, perimeter security fence, signing, striping and pavement marking, curb and gutter, landscaping, tree removal, and adjusting and relocating utilities and amenities in and around the project site.

Status:

A-E Agreement approved with Stantec on June 18, 2013.

Upcoming Milestones:

Construction bid advertisement anticipated on October 1, 2014.

Project Manager:

Kory Hariri
(949) 252-6098
khariri@ocair.com

Project Name:

Lighting System Upgrades

Project No.:

P402

Project Description:

Throughout the Riley Terminal and other facility locations, JWA currently utilizes a mixture of T12 parabolic fixtures, T12 soffit fixtures, T12 open architecture fixtures, multi-lamp open architecture fixtures, high-intensity discharge (HID) fixtures, and high pressure sodium light fixtures. JWA seeks to replace these fixtures with efficient T8, LED, or similar fixtures.

Status:

TTG Engineers selected as the primary A-E firm and P2S Engineering, Inc. as the alternate firm.

Upcoming Milestones:

Board award anticipated in September 2014.

Project Manager:

Leo Tang
(949) 252-6068
ltang@ocair.com

Project Name:

Cellphone Lot Project

Project No.:

P405

Project Description:

The Cellphone Lot Project will reconfigure the existing taxi lot to accommodate both a taxi staging lot and a separate cellphone lot. The existing taxi lot, in its current configuration, accommodates roughly 105 taxis and limos. The new design will divide and reconfigure the lot to accommodate roughly 115 taxis and limos in one lot, and roughly 33 spaces for airport patrons in the cellphone lot.

Status:

A-E contract awarded to Civil Works, Inc. on May 30, 2014.

Upcoming Milestones:

 

Project Manager:

Arbella Arsenous
(949) 252-5128
aarsenous@ocair.com

Last Updated: September 15, 2014