Airport Projects

John Wayne Airport anticipates issuing Requests for Proposals (RFPs) / Requests for Qualifications (RFQs) for the following projects and architect-engineering (A-E) contracts. Please note that this list may not be complete, and all dates are estimates and subject to change at any time.

Project Name:

Paularino Gate Improvements Project

Project No.:

P211

Project Description:

The project is located near the intersection of Paularino and Airway Avenues in Costa Mesa and will involve the replacement of failed pavement on Paularino Avenue; the replacement of two airfield gates with crash-resistant gates; the replacement of a guard booth and installation of an additional guard booth and access control; installation of crash-resistant fencing; installation of additional lighting at the gates; pavement replacement and enlargement of a parking lot; and construction of a covered entryway to the JWA administration building.

Status:

Bid submission is open to prequalified contractors until:
March 29, 2017 at 2:00 p.m. PST.
Sign in to download P211 Project Information

Upcoming Milestones:

Mandatory Pre-bid Meeting:
March 2, 2017 at 10:00 a.m. PST
Bidders' Questions Submission Deadline:
March 16, 2017 at 4:00 p.m. PST
Bid Submittal Deadline:
March 29, 2017 at 2:00 p.m. PST

Project Manager:

John Pape
jpape@ocair.com

Project Name:

Pavement Maintenance and Repair

Project No.:

P305

Project Description:

John Wayne Airport (JWA) is inviting General Contractors to submit Prequalification Documents for the Pavement Maintenance and Repair project.

Status:

Download Notice Inviting Prequalification for General Contractors

Upcoming Milestones:

Questions due:
February 16, 2017 by 3:00 p.m. PST
Prequalification Documents due:
February 22, 2017 by 3:00 p.m. PST

Project Manager:

Rick Cathey
(949) 252-5129
rcathey@ocair.com

Project Name:

Station 18 Improvements and Emergency Operations Center Project

Project No.:

P409

Project Description:

The objective of the Station 18 Improvements and Emergency Operations Center (EOC) project is multifold. The Station 18 portion of the project will include the construction of a redundant sheriff dispatch center in JWA Building 366 that will be utilized while retrofits to the existing sheriff dispatch center located in Terminal A are constructed. Construction will include the relocation of numerous information technology systems located at the airport.

Status:

Prequalification Documents were due on June 15, 2015.

Upcoming Milestones:

Request for Proposals advertisement is anticipated in March 2016.

Project Manager:

Steve Chaky
(949) 252-5275
SChaky@jwair.com

Project Name:

Taxiway Bravo Rehabilitation

Project No.:

P410

Project Description:

Taxiway Bravo is a 75’ wide, full-length, parallel taxiway to Runway 2L/20R. The taxiway serves commercial jets as well as general aviation. The project will rehabilitate Taxiway Bravo from the south end at Taxiway Delta approximately 4,300’ north to a previously completed rehabilitation project. The rehabilitation should extend the service life of the taxiway an additional 20 years. The project will also phase construction to minimize impacts to both commercial and general aviation aircraft operations. Additionally, the project will realign the centerline striping at the Taxiway Bravo/Taxiway Lima intersection according to current FAA standards.

Status:

A-E Agreement awarded to Kimley-Horn.

Upcoming Milestones:

Notice Inviting Bids expected late 2017

Project Manager:

Steven Carrillo
(949) 252-6020
scarrillo@ocair.com

Last Updated: February 17, 2017


The information above is subject to change at any time without notice and may not be all-inclusive.