John Wayne Airport anticipates issuing Requests for Proposals (RFPs) / Requests for Qualifications (RFQs) for the following projects and architect-engineering (A-E) contracts. Please note that this list may not be complete, and all dates are estimates and subject to change at any time.

Project Name:

Architect-Engineer Services for Geographic Information System (GIS) Development

Project Description:

John Wayne Airport (JWA) intends to contract with an Architect-Engineer (A-E) firm that specializes in Geographic Information System (GIS) development at airports. The A-E firm will be responsible for preparing GIS standards, guidelines, and implementation plans as well as collecting, evaluating, converting, and/or mapping data to manage land, facilities, assets, and utilities.

Status:

SOQ's are due 4:00 PM PST on Tuesday, April 5, 2016.

Upcoming Milestones:

A-E Selection anticipated April 11, 2016

A-E Award anticipated June 28, 2016

Project Manager:

Steve Carrillo
(949) 252-6020
scarrillo@ocair.com

Project Name:

Carpet Replacement at JWA Administration Building

Project Description:

JWA requires the services of a qualified Contractor to provide complete and necessary services for replacement of the existing floor covering and base boards per approved plans and specifications for the John Wayne Airport Administration building.

Status:

Download Notice Inviting Bid

Upcoming Milestones:

Mandatory Job Walk: 12:00 PM PST, Thursday, May 19, 2016

Questions due: 12:00 PM PST, Wednesday, May 25, 2016.

Bid Packages due: 3:00 PM PST, Friday, June 3, 2016

Project Manager:

For more information, connect to Bidsync.

Project Name:

Upgrade of the Emergency Crash Phone System

Project Description:

JWA requires the services of a qualified Contractor to upgrade the ECPS to the Forum Communications' Alert III CrashNet system, survey and identify the existing communications pathways while clearly and permanently marking the source and destination. The Contractor will also pull new cable to replace any damaged existing cables or to update any cable on conforming to today's standards.

Status:

Questions are due 4:00 PM PST on Wednesday, May 11, 2016.

Upcoming Milestones:

Proposal Packages are due by 4:00 PM PST on Wednesday, May 18, 2016

Evaluation of Proposals anticipated
May 23, 2016 through June 2, 2016

Project Manager:

For more information, connect to Bidsync.

Project Name:

Architect-Engineer Services for Program Management Services at John Wayne Airport

Project No.:

P101

Project Description:

John Wayne Airport (JWA) utilizes private architect-engineering (A-E) firms to help manage its Capital Improvement Program (CIP) and other airport projects.

Status:

SOQ's were received on January 15, 2016

Upcoming Milestones:

Selection of firms by Board of Supervisors anticipated on April 12, 2016.

Project Manager:

John Pape
(949) 252-6058
jpape@ocair.com

Project Name:

Architect-Engineer Services for Geotechnical Engineering, Materials Testing, Construction Observation And Inspection Services

Project No.:

P107

Project Description:

John Wayne Airport (JWA) utilizes private architect-engineering (A-E) firms to perform the following specialized services: Geotechnical Engineering, Materials Testing, Construction Observation and Inspection.

Status:

SOQ’s were received on February 23, 2016

Upcoming Milestones:

Selection of firms by Board of Supervisors anticipated on June 28, 2016

Project Manager:

Steve Carrillo
949-252-6020
scarrillo@ocair.com

Project Name:

Paularino Gate Improvements

Project No.:

P211

Project Description:

Reconstruction of the Paularino Avenue entry and access road, installation of hardened security fencing and gates, improved security lighting, and improvements to the JWA Eddie Martin Administration building entryway and visitor parking lot located at 3160 Airway Avenue, Costa Mesa.

Status:

Download Notice Inviting Bid

Upcoming Milestones:

Mandatory Pre-bid Meeting:
March 24, 2016 at 10:00 am
Questions due:
May 10, 2016 at 4:00 pm.
Bid Submittal Due Date:
June 1, 2016 at 2:00 p.m.

Project Manager:

John Pape
(949) 252-6058
jpape@ocair.com

Project Name:

Pavement Maintenance and Repair

Project No.:

P305

Project Description:

Maintenance and repair of asphalt and concrete pavement on the airfield, and in vehicular traffic areas at JWA. The maintenance and repair includes pavement replacement, overlays, spall repair, slurry seal, seal coats, rubber removal, joint seal, repair of damaged underground utilities, adding bollards for safety, drainage and erosion control system repairs, and emergency repairs. The project also includes repair and reconstruction of underground utility structures.

Status:

Download Notice Inviting Bid

Upcoming Milestones:

Mandatory Pre-bid Meeting:
May 25, 2016 at 9:00 a.m.
Questions due:
June 1, 2016 at 3:00 p.m
Bid Submittal Due Date:
June 15, 2016 at 2:00 p.m.

Project Manager:

Rick Cathey
rcathey@ocair.com

\

Project Name:

Lighting System Upgrades Project

Project No.:

P319

Project Description:

The objective of the Lighting System Upgrades project is to replace aging lighting systems, paint some ceilings, and install outlets for electric cars in parking structures at John Wayne Airport. 

Status:

Download Notice Inviting Bid

Upcoming Milestones:

Mandatory Pre-bid Meeting:
April 21, 2016 at 10:00 a.m.
Questions due:
April 25, 2016 at 12:00 pm.
Bid Submittal Due Date:
April 27, 2016 at 2:00 p.m.

Project Manager:

Arbella Arsenous
aarsenous@ocair.com

Project Name:

Architect-Engineer Services for Central Utility Plant Performance Analysis

Project No.:

P404

Project Description:

John Wayne Airport (JWA) is seeking Statements of Qualifications (SOQs) from Architect-Engineers (A-Es) experienced in cogeneration power plant performance analysis and the applications for battery energy storage technology to cogenerations power plants. 

The A-E services shall include analysis and performance recommendations for the following: cogeneration power plant and plant controls; power distribution; load shedding; black start capability; and cost analysis for planning plant enhancements.

Status:

Download Request for Qualifications

Upcoming Milestones:

SOQ's are due 4:00 PM PST on
Friday, May 6, 2016.

Project Manager:

Don Horn
(949) 252-5097
dhorn@ocair.com

Project Name:

Station 18 Improvements and Emergency Operations Center Project

Project No.:

P409

Project Description:

The objective of the Station 18 Improvements and Emergency Operations Center (EOC) project is multifold. The Station 18 portion of the project will include the construction of a redundant sheriff dispatch center in JWA Building 366 that will be utilized while retrofits to the existing sheriff dispatch center located in Terminal A are constructed. Construction will include the relocation of numerous information technology systems located at the airport.

Status:

Prequalification Documents were due on June 15, 2015.

Upcoming Milestones:

Request for Proposals advertisement is anticipated in March 2016.

Project Manager:

Steve Chaky
(949) 252-5275
SChaky@jwair.com

Project Name:

Taxiway Bravo Rehabilitation

Project No.:

P410

Project Description:

Taxiway Bravo is a 75’ wide, full-length, parallel taxiway to Runway 2L/20R. The taxiway serves commercial jets as well as general aviation. The project will rehabilitate Taxiway Bravo from the south end at Taxiway Delta approximately 4,300’ north to a previously completed rehabilitation project. The rehabilitation should extend the service life of the taxiway an additional 20 years. The project will also phase construction to minimize impacts to both commercial and general aviation aircraft operations. Additionally, the project will realign the centerline striping at the Taxiway Bravo/Taxiway Lima intersection according to current FAA standards.

Status:

A-E Agreement awarded to Kimley-Horn.

Upcoming Milestones:

Notice Inviting Bids expected October 2016.

Project Manager:

Steven Carrillo
(949) 252-6020
scarrillo@ocair.com

Project Name:

Common Use Passenger Processing System (CUPPS) Relocation Project

Project No.:

P419

Project Description:

The Common Use Passenger Processing System Relocation Project will provide point of sale machine infrastructure and anchoring as well as demolition of existing infrastructure for current point of sale machines. The project will also address any necessary repairs to floor finishes affected by the demolition.

Status:

Bids were received on March 9, 2016.

Upcoming Milestones:

Selection of firms by Board of Supervisors anticipated on May 24, 2016

Project Manager:

Steve Chaky
(949) 252-5275
schaky@jwair.com

Last Updated: May 16, 2016