John Wayne Airport

Directions to John Wayne Airport

John Wayne Airport can be accessed by the San Diego (I-405) Freeway, the Costa Mesa (SR-55) Freeway, and the Corona Del Mar Freeway/San Joaquin Hills Transportation Corridor Toll Road (SR-73).

Terminal Address:

Thomas F. Riley Terminal
18601 Airport Way
Santa Ana, CA 92707

Main Street (Remote) Parking:

1512 Main Street
Irvine, CA 92614

 

Directions:

Traveling north from San Diego:

To Terminal & Terminal Parking:

Take the I-5 North to the I-405 North
Exit MacArthur Blvd off ramp
Turn left on MacArthur Blvd
Turn right at the next traffic light
into the Terminal Roadway

To Main Street Parking Lot:

Take the I-5 North to the I-405 North
Exit MacArthur Blvd off ramp
Turn right on MacArthur Blvd
Turn left on Main Street
Main Street Parking lot is on the left
after Sky Park Circle

Traveling south from the South Bay:

To Terminal & Terminal Parking:

Take the I-405 South
Exit MacArthur Blvd off ramp
The Terminal roadway entrance is
straight across MacArthur Blvd

To Main Street Parking Lot:

Take the I-405 South
Exit MacArthur Blvd off ramp
Turn right on McArthur
Turn left on Main Street
Main Street Parking lot is on the left
after Sky Park Circle

Traveling south from Los Angeles:

To Terminal & Terminal Parking:

Take the I-5 South to the SR-55 South
Take the transition to the I-405 South
Stay in the right lane and exit at John Wayne Airport

To Main Street Parking Lot:

Take the I-5 South to the SR-55 South
Exit MacArthur Blvd and turn left
Turn right on Main Street
Main Street Parking lot is on the left
after Sky Park Circle

Traveling from Riverside:

To Terminal & Terminal Parking:

Take the SR-91 West to the SR-55 South
Take the transition to the I-405 South
Stay in the right lane and exit to John Wayne Airport

To Main Street Parking Lot:

Take the SR-91 West to the SR-55 South
Exit MacArthur Blvd and turn left
Turn right on Main Street
Main Street Parking lot is on the left
after Sky Park Circle

 

CONSTRUCTION ALERT:

The Airport Improvement Program is underway with major construction of a new Terminal C, Parking Structure C and the Central Utility Plant. Passengers and visitors to JWA will notice a significant amount of construction activity in and around the Riley Terminal. Please exercise caution due to ongoing construction activities and periodic lane closures.

Speed limits have been reduced to 15 mph due to the ongoing construction and are being strictly enforced.
 
Visit our Airport Improvements Program Web site for more information and active construction alerts...